Phil Peel

Film, video, photography, sound and story

Thursday night was the annual “turning on” of the Christmas Lights in Salisbury, which I’ve been covering on multicamera for at least the last 10 years.

Salisbury Xmas video screen and fireworks

When doing live multicamera events I always have technical backups, as it’s surprising how often equipment goes down. I think probably the new generation of digital computer controlled systems that can do things we only dreamt about a few years ago are amazing,  but have a nasty habit of crashing when you least expect it.  Gareth Henderson from River Studios told me today that he’s gone back to using analogue audio mixers for live events because of similar problems.

I was using the new ATEM Television Studio HD mixer. It had arrived the week before and immediately failed, so this was my second one in a week. This one also had been showing some intermittent faults, but I didn’t have time to return it. I hoped it would be alright on the night.

Well it wasn’t. After  all the cameras were set up and we ready to go,  the mixer locked up and decided it was going to show green   …and nothing else for the rest of the evening.

ATEM HD Video mixer

 

So onto plan B. I had brought along and set up an standard definition mixer, as a back up. I knew that the large LED screen, though impressive is actually only standard definition. Of course all the cameras had been originally cabled for High Definition SDI, but I had put in extra sd composite cables for this eventuality.  I didn’t really have enough preview monitors, to be able to preview all the camera  feeds, so the vision mixing couldn’t be quite as slick as I would have liked. But the audience didn’t know and it looked great on the huge LED screen.

Here’s Paul vision mixing. Bit of an untidy monitor stack. Smile

Vision Mixing

 

The show included Salisbury Rock Choir, singers Jamie Eldridge and Steph Murray,The Delorans and the mandatory celebrity…this year Keith Chegwin, who counted down to the fireworks.

Keith Chegwin Multicamera OB

 

My natural tendency when directing is to point all the cameras at the action, which at the end of the show is the fireworks, but I realised that this is a bit pointless as the audience can see the real thing, so I point the cameras at audience and do an artistic mix of faces and fireworks. The kids in particular love seeing themselves up on the bit screen.

audience on multicamera OB monitor

Robin on camera in front of the Guildhall.

P1050373

Here’s Paul Witcombe on camera

Paul on camera

 

Terry resolutely ignoring the wonderful display behind him!

Terry on Camera

 

..and the view from the audience

big led screen on multicamera OB

Live location multicam internet streaming success

Posted by Phil On September - 12 - 2011

The multicam at Ishtar restaurant for the Musicality website went well. For me the highlight was when the manageress interrupted Jesse Conrad’s performance to say hello to her mother, who was watching in Turkey.

It was all bit cramped and very hot. By the time we packed all the kit away and got back home to Southampton it was 3am.

After 4 hours sleep it was up at 7 to get to Bournemouth for a full days editing on the the Kids in Care film with Lisa. Luckily we argued (debated) a lot, so I didn’t fall asleep over the laptop. Would have been embarrassing that. 🙂

Camera work on Royal Wedding

Posted by Phil On May - 4 - 2011

Pete Bowen, an ex student of mine, somewhat outdid my little OB, a few days later with his work on a slightly bigger one  🙂

Pete Bowen in westminster Abbey

Here’s his view.    Total worldwide audience of 2 billion.

pete Bowens camera view of Royal wedding

Well done Pete.  I’m proud of you!

 

 

DSC00630

Meeting up with the student crew from Solent University.  A really keen group. I seem to be doing my normal trick of waving my arms around a lot.  🙂

 

DSC00621

Going through the script with Will, who was  vision mixing.

 

I had worked through the script, doing the normal analysis, highlighting who was speaking when, so I could work out which cameras could cover what. But though many scenes had 2 or 3 characters in, some had  6 to 8  and one had 13 different speaking roles.  As a scriptwriter my instinct would be to cut the number of characters, but this was the Last Supper.  Not a scene were you could suggest cutting the numbers of participants!   🙂

DSC00691

So on the Thursday afternoon, after some debate, we worked out the camera positions. With 5 stages and 8 cameras to cover them, it might seem a lot of cameras, but  with 3 stages at one end of the square and 2 at the other it meant less than 2 cameras for each stage. So the solution was to have the cameras fairly central at each end, so they had clear sightlines and could move across to cover each stage as needed.  The difficulty was that some of these moves were very fast.

 

Friday morning,  we went through a fairly haphazard rehearsal, which highlighted the problems of moving the cameras around quickly to get decent sightlines. Not helped by having spare staging blocking our camera positions.

 

But more critical was my inability to simultaneously direct and read my script notes.

DSC00692

Unfortunately there was no-one available who could act as production assistant.  So the VT operator offered to help.  Sorry I can’t remember your name

DSC00704

So we went through the pages of script.

 

P1020262-1 P1020263-1

 

The way I mark up a performance script is to highlight the performers on the script and then add info on where they are standing and moving on the facing page.  For the Last Supper scene I ran out of different highlighter colours !

 

DSC00693

Solent’s OB truck is slightly oddly designed for vision mixing. The front is filled with the most enormous spectacular wall to wall audio mixer, custom fitted, but the vision mixer is tucked away at an angle on a side table. The output monitor is little too high to see in the same sightline as the mixer without neck ache  and there isn’t a lot of space to put scripts on.   Still after a bit of re-arranging the furniture we got a workable compromise.  You can see me peering at the monitor.

 

DSC00713

VT play in was from an Ipad, which you can see at the bottom here.

 

First off was the warm up band

P1020124

 

Anyway dead on 7:30  the square was filled with people and we got the the OK to go and played in the first opening VT.

…at which point the was a bang and everything went dead.

Coming out of the darkened truck, everyone wondered what had happened. I could smell burning and it was eventually tracked down to a burnt out power cable, which had been left coiled up under the truck.

A good example of the effect of running power through a coiled up cable drum. It gets very HOT!

DSC00718

It was actually quite fortuitous that it had blown before the main performance had commenced.

So having powered up again, (it would have been saved a few headaches if the truck had had a UPS (uninterruptible power supply) everything seemed OK so we  started again. Unfortunately the Audio mixer hadn’t fully rebooted.  …and that took an age. then the “Stageboxes” needed rebooting.

Everybody was hustling the poor guy on the audio desk “How long ..how long?”   but he did a great job of staying cool and working his way through he menus.

 

(It seems you can’t switch on anything  technical nowadays, without it having to “boot up”

There are some disadvantages to computers. )

DSC00696

You can see the audio desk in the background here.

 

So as the large audience were waiting, we decided to go ahead with the vision only and PA people would play in the sound for the opening VT independently. So we ran the VT pix and  Phil le Clem ran from us to PA desk counting out loud to get the  sync right. 🙂

DSC00694

 

The plan was to get OB truck  sound system sorted out as we were “broadcasting” the programme.

 

DSC00716

This worked fine, except we couldn’t get the on stage sound out on the OB truck internal speakers, which meant I couldn’t hear anything. Not easy to mix complex multi-character scenes when you can’t hear the dialogue.  So we opened the door and I listened to the sound from the main PA!    🙂

Not easy to identify who is talking, when you’re listening to an echoing PA.  still it seemed to work.

 

DSC00726

So we started with the 3 stages at one end of the square.  then a procession covered by wireless link camera through to the other end

 

DSC00723

..and back to the first stage.    …and then back and forht a few times.

DSC00720

The only other problem was a short VT play-in from the Ipad of a nicely filmed dramatic scene.

When we came to play this the sound was fine but no pictures!   I decided that as we were right in the middle of the most dramatic parts of the play it would be best not to stop. The audience could hear what was happening and hopefully think it was a deliberate artistic decision.

When the sequence had finished, we discovered that all we needed to do was unplug and replug the Ipad and it ran the video pictures fine.  Must have been very frustrating for the film crew after all the time spent producing the sequence. but that’s what happens with live TV.

 

So apart from these technical hitches, it all ran fine. The camera crew and I had all learnt to work together and from the feedback we got the organisers were very happy too.

 

So  a good day.